Design season: spring installs book firstCall 509-260-3659Swiftwater Houseworks →

Rockery project

The 500-Foot Rockery Wall in Ronald

Ronald202510 photos

More than 500 feet of boulder rockery along a steep switchback drive above Lake Cle Elum. Less than a month after we finished, record rain hit, and the wall held.

Ronald sits on the road up to Lake Cle Elum, and plenty of lots up here are steep. This one has a switchback gravel driveway climbing the hillside to the home, with a cut slope along it, and the owners dealt with flooding every year. Between September and November 2025, we built one of our largest rock walls: a boulder rockery more than 500 feet long and about 4 feet tall.

The problem

A cut slope above a driveway wants to come down. Rain and snowmelt wash soil off the face, and on a steep drive, moving water picks up speed and takes gravel with it. On this property, the flooding came back every year.

September, before the build: the wall line marked out along the cut slope
September, before the build: the wall line marked out along the cut slope
The rockery curving with the driveway, with mountains in the distance
The rockery curving with the driveway, with mountains in the distance

The plan

The fix had to handle both the slope and the water:

  • A rockery more than 500 feet long and about 4 feet tall, holding the cut slope along the drive below the home.
  • Regrading the driveway.
  • A deeper drainage ditch, sized for the fall and winter rain.

A rockery suits a job like this. Big boulders, set well, lock together and hold the hill, and the look fits the rock and timber around Lake Cle Elum.

The rockery where the driveway meets the road
The rockery where the driveway meets the road

The build

We marked out the wall line in September; you can see it in the before photo. Then we set the wall boulder by boulder, following the drive as it switches back up the hill. Our own operators graded the driveway and dug the deeper ditch as part of the same project. The drone photos show the whole run of the wall, with Lake Cle Elum in the valley below.

The rockery holding the hillside as the drive climbs, with fall color above
The rockery holding the hillside as the drive climbs, with fall color above

The test came early

Less than a month after we finished, record rainfall hit. Flash-flood waterfalls poured over the hillside.

The wall held.

For a property that had flooded every year, that was the whole point. The water came down the hill the way it always had, but this time there was a wall holding the slope and a deeper ditch ready for it.

If your place has a steep drive, or a cut bank that sheds dirt every spring, it’s worth a look before next season. For a wall built before a home went up, see our rock wall and site prep project.

Got a slope that won’t stay put, or water that shows up every spring? Book a free design consult or call 509-260-3659. Brandon will walk it with you and talk through what would hold.

Lake Cle Elum and its valley below, seen from above the job site
Lake Cle Elum and its valley below, seen from above the job site

Free design consult

Start with a walk around your property

Brandon will walk the property with you, listen to what you have in mind and talk through what will work on your slope, soil and snow. The consult is free.